Horizon Wind Signs PPA With Snohomish PUD
Horizon Wind Energy LLC has entered into a long-term power purchase agreement (PPA) with Snohomish County Public Utility District (Snohomish) in Oregon to sell renewable wind energy from the Wheat Field Wind Farm. Horizon’s Wheat Field Wind Farm, located in Gilliam County, Oregon, will have an installed capacity of 96.6 megawatts (MW) and will use 46 Suzlon S88 2.1-MW turbines.
Read the rest of the post here:
Horizon Wind Signs PPA With Snohomish PUD
Related Posts
Follow-Up: How Can China’s Wind Power Industry Be Growing So Fast?
This summer, a two-part story written by China Strategies LLC elicited many questions about the Chinese wind power industry. Many of the questions were raised by the investment community and centered around a US $450 million contract between Chinese wind turbine manufacturer, Sinovel Wind Power Science and Technology Co. Ltd., and American Superconductor (AMSC). In an attempt to set the record straight, we offer this follow-up story.
Read more:
Follow-Up: How Can China’s Wind Power Industry Be Growing So Fast?
Related Posts
Vestas Commends Colorado at DNC in Denver
This week, political leaders from Colorado joined representatives from Vestas at a press conference held at the Democratic National Convention (DNC) in Denver, Colorado. Against the backdrop of a 131-foot wind turbine blade produced at Vestas’ factory in Windsor, Colorado, the participants discussed the company’s expansion in the U.S. as well as public policy measures needed to further strengthen wind power’s role as a necessary and vital part of the nation’s energy future.
More here: Vestas Commends Colorado at DNC in Denver
